The project scope was to supply and install trace heating to frost protect the following metal pipework:
- 8th floor - 54m of CHW pipework
- 9th floor - 45m of CHW pipework
- 9th florr - 20m of MCW pipe
- 9th floor - 10m of condensate pipe
- Riser - 40m of MCW pipe