Friday 29 August 2008

Hilton Hotel - Manchester Airport
ESH were contracted to inspect and test the existing trace heating system and advised accordingly.

Wednesday 27 August 2008

Marks & Spencers - Worcester 
ESH supplied, installed and commissioned trace heating to frost protect the LTHW pipework: four sets of metal pipe up to 48mm OD, flow and return, 44m in all.

Tuesday 19 August 2008

Andrew Corporation - USA
Designed and supplied 32 x 3.7m dish heater panels to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.

Thursday 14 August 2008

Temple Moor High School - Leeds
To supply materials and labour to install a trace heating system to provide frost protection to the AHU pipework mounted on the roof area.

Tuesday 12 August 2008

Ashford WWTW
For this project the Sodium Hydroxide pipework needed to maintain a temperature of +20°C in a minimum ambient of -15°C. ESH supplied and installed 105m of type FBTBOJ self regulating heating tape to complete the job.

Monday 11 August 2008

Wintringham Academy - Grimsby
Type H2OWAT55 self limiting heating tape was supplied and installed onto the HWS pipework in order to maintain the pipe temperature at +55°C.
Forbes Technologies Ltd - Kelso
Designed, supplied and installed a trace heating system to temperature maintain a large tank 3.05m Ø X 3.79m high and the associated pipework, at +30°C.

Friday 8 August 2008

Bulmers Cider Company - Hereford
ESH supplied 220m of type VC constant wattage trace heating cable, for installation onto the sprinkler system to provide frost protection.

Wednesday 6 August 2008

Budds Farm WTW - Havant
ESH supplied 100m of type FBTBOJ self limiting heating tape to this project.