Wednesday 19 March 2008

Paradise Street Development - Liverpool
For this project ESH supplied and installed trace heating to provide frost protection to 50m of 22mm Ø copper pipework to a bib tap.

Thursday 13 March 2008

Poaka Beck WTW - Cumbria
Supplied, installed and commissioned the trace heating system to proved frost protection to the following areas: Lamella Plant, Uncontaminated pump station, Dirty washwater balance tank, Interstage pump station, Air blower drain lines and the Feed pump station.

Tuesday 11 March 2008

Trox (UK) Ltd - Norfolk
ESH designed and manufactured 10 x heating panels 440 watts 240v c/w with earth screen.

Thursday 6 March 2008

Calsonic Kansei - Tyne & Wear
ESH designed and manufactured 2 x IBC heating jackets 100w 240v c/w complete with thermostatic control.

Wednesday 5 March 2008

Derby STW 
60m of type FBTBOJ self regulating heating tape was supplied and installed onto both steel and plastic pipework to provide frost protection.