Wednesday 22 October 2008

Mythe Water Treatment Works
For our second visit to this site, ESH supplied and installed frost protection trace heating for the Surge tank and associated pipework.

Tuesday 14 October 2008

Seedy Mill WTW - Lichfield
To design, supply materials and labour to install both trace heating and thermal insulation to provide temperature maintenance at +15°C for plastic dosing pipework.

Thursday 9 October 2008

Nottingham University - Maths & Physics Building
Type ESRS self limiting heating tape was supplied and installed to provide frost protection to a small length of external pipework.

Monday 6 October 2008

Whitlingham WWTW
Supplied and installed trace heating to frost protect the following: 

  • Cambi plant - two effluent pipe runs
  • Sludge transfer pipework
  • Contact tank infill and SAS pipework
  • Contact tank mixer pump station
  • Thickened SAS transfer pump station pipework
  • Strain press pipework

Friday 3 October 2008

Sentrum - Woking 
To supply materials and labour to install and commission trace heating to provide frost protection to the external chilled water pipework, this also included 16m of 100mm/200mm pipework in each of the 3 McQuay chiller units.

Thursday 2 October 2008

Network Rail - Guildford 
Supplied 480m of type VC constant wattage heating tape to this project.