Tuesday 29 January 2008

Kingspan Insulation Ltd - Leeds
Supplied materials and labour to install and commission a trace heating system to maintain a temperature of +25°C on 4" & 5" pipework.

Friday 25 January 2008

Cotton Valley STW - Milton Keynes
For this project ESH supplied and installed trace heating to three condensate pots in a Zone 1 Class T3 Gas Group IIB Hazordous Area.

Tuesday 22 January 2008

Cadbury - Bournville 
ESH were contracted to supplied and installed a temperature maintenance system to the HWS pipework during the dining refurbishments.

Monday 21 January 2008

Kings Lynn STW - Norfolk 
Supplied and installed trace heating to provide frost protection to 210m of condensate pipework.

Friday 18 January 2008

Tessenderlo Fine Chemicals Ltd - Leek
ESH supplied 210m of type SCBX (ATEX approved constant wattage heating tape) for the use on two large tanks and associated pipework.

Thursday 17 January 2008

Merchants Academy - Bristol
ESH were contracted to supply and install frost protection to the external pipework as well as to temperature maintain the HWS pipework at +55°C.

Wednesday 16 January 2008

Synthite Ltd - Mold Clwyd
To supply and install trace heating to 90m of steel pipework carrying 37% formalin. The pipework and fittings needed to maintain a temperature of +25°C.

Monday 14 January 2008

RAF Menwith Hill - Harrogate
Supplied and installed a frost protection trace heating system to 1, 2, 3, 6, 8 and 10 inch pipework, totalling 130m.

Tuesday 8 January 2008

Jakemans (Confectioners) Ltd - Boston
Supplied materials only to maintain the temperature of 2" stainless steel pipework at +40°C.