Friday 28 November 2008

Derby STW
Designed, supplied materials and labour to install frost protection to a Condensate Pot - 900mm dia x 1750mm tall.

Wednesday 26 November 2008

Wootton Place - Oxon
Wootton Place is an exclusive private development of 13 luxury houses. Here we supplied and installed 153m of H2OWAT55 heating tape, to temperature maintain flow pipework carrying domestic hot water to Douches.

Tuesday 25 November 2008

Pure Office Building - Swindon
For this new office development, ESH supplied and installed trace heating to temperature maintain pipework carrying domestic hot water at +55°C. 129m of heating tape required in total.

Monday 24 November 2008

Esholt WWTW - Bradford
Supplied Hazardous Area trace heating cable and thermostats to this project.

Friday 21 November 2008

Warburtons Bakery
Supplied Warburtons with our type VC constant wattage heating tape.

Thursday 20 November 2008

Calthorpe House - Edgbaston 

Within this prestigious 107,044 sq ft office accommodation, ESH frost protected external pipework against minimum ambient temperatures of -15 degrees C. Overall 600m of FBTOJ heating tape was used.

http://www.traceheatingdirect.com/self-regulating-heating-tapes.html
UBHT Hospital - Bristol
The project scope was to supply and install trace heating to frost protect the following metal pipework: 

  • 8th floor - 54m of CHW pipework
  • 9th floor - 45m of CHW pipework
  • 9th florr - 20m of MCW pipe
  • 9th floor - 10m of condensate pipe
  • Riser - 40m of MCW pipe

Wednesday 19 November 2008

Lownethwaite WTW - Richmond 
ESH supplied and installed frost protection trace heating to 90m of metal pipework.
Chester WWTW
Supplied and installed trace heating to 80m of metal washwater pipework using type VC constant wattage heating tape.

Tuesday 18 November 2008

Complete Energy System - Cheshire
Supply materials and labour to complete the installation and commissioning of self regulating frost protection trace heating on the cold water supply pipework.

Friday 14 November 2008

Northampton Museum & Art Gallery
Supplied materials and labour to install and commission trace heating to frost protect pipework associated with two chillers on the roof of the building.

Wednesday 12 November 2008

The Heights - Brookland
Within this prestigious commercial office development, ESH supplied and installed 120m of type VC constant wattage trace heating tape, to provide frost protection.

Tuesday 11 November 2008

Filpumps Ltd - Aberdeenshire 
Supplied 580m of type VC constant wattage heating cable.
Didcot Rail Centre
Designed, supplied materials and labour to install and commission trace heating to frost protect pipework associated with 3 chillers and 4 AHU's. Overall 330m of type VC heating tape was required.
Marks & Spencers - Luton Arndale Centre
For this new Marks & Spencers store, ESH supplied and installed trace heating to frost protect the following pipework: 

  • 45m of MCWS in the external basement loading bay area
  • 229m of heating pipework on the roof, with connections to three air handling units
  • 25m of MCWS in the internal loading bay area

Monday 10 November 2008

Unipet International Ltd - Kent
Type SC constant wattage heating cable was installed onto the beef fat pipework to maintain the temperature above +55°C. The pipework run both internal and external of the building with varying minimum ambient temperatures.

Friday 7 November 2008

Marstons Brewery - Burton On Trent
Supply materials and labour to install and commission a trace heating system to maintain a temperature of +30°C on grain pipework in a minimum ambient of -15°C.

Thursday 6 November 2008

Headrow Building - Leeds
300m of type VCB constant wattage trace heating tape was supplied and installed to frost protect the CHWS & LTHWS pipework. Also 50m of FBT self regulating tape was supplied and installed onto the 6" sprinkler pipework to provide frost protection.

Monday 3 November 2008

Omya UK Ltd - Melton
A trace heating system was supplied and install to provide frost protection to the 4" Ø pipework.