Friday 27 June 2008

Dairy Crest - Nuneaton
Supplied and installed trace heating to frost protect the following pipework: 

  • 34m of MCWS and 27m of heating pipework on the roof area
  • 35m of MCWS pipework from the high level plant room to a drench shower and wash down tap in the loading bay/skip area
  • 15m of MCWS incoming mains to a drench shower in the ground floor plant room area

Thursday 26 June 2008

Market Hall - Bolton
Scope of work was to supply and install the electrical trace heating to provide frost protection to the condenser pipework and the cold water services (flow and return) pipework, all situated on the roof area.

Wednesday 25 June 2008

Rochdale WWTW
The project scope was to design and supply materials and labour to install trace heating and thermal insulation to both steel and plastic pipework, to provide frost protection.

Tuesday 24 June 2008

Soseki Japanese Restaurant - London 
ESH supplied and installed 70m of type H2OWAT55 self limiting heating tape, to maintain the DHWS pipework at +55°C in an ambient of +18°C.

Monday 23 June 2008

Cantor Building - Sheffield Hallam University 
The Cantor building on Furnival Street houses elements of the Faculty of Arts, Computing, Engineering and Sciences, as well as other campus facilities. For the large scale project ESH supplied and installed trace heating to provide frost protection to the exposed CTH, CHW & MCW service pipework.

Friday 20 June 2008

Royal Naval Air Station - Culdrose
To design and supply materials and labour to install and commission trace heating to provide frost protection to the 6" Ø steel pipework.

Thursday 19 June 2008

IBIS Hotel - Birmingham
ESH designed, supplied, installed and commissioned a trace heating system to provide frost protection to the chilled water pipework (flow and return) and cold water service pipework. In total 142m of pipework in five runs, three on the hotels roof.

Wednesday 18 June 2008

Netstore Plc - Reading
For this project ESH were contracted to supply materials and labour to install a trace heating system to frost protect 1500mm NB pipework.

Tuesday 17 June 2008

Burnley WWTW
ESH supplied and installed an additional 90m of type FBTBOJ self limiting tape to this ongoing project.

Wednesday 11 June 2008

Tessenderlo Fine Chemicals Ltd - Leek
Designed and supplied a trace heating system to be applied onto a tank 2.95m Ø x 2.1m high, in a Zone 1 Gas Group 11b Classification T3 electrically Hazardous Environment.

Monday 9 June 2008

Oasis Academy - Immingham
1600m of type H2OWAT55 self regulating heating tape was supplied, installed and commissioned to maintain the DHWS pipework at +55°C.

Thursday 5 June 2008

Boots Opticians - Higher Chelmer Shopping Centre
ESH supplied and installed 75m of H2OWAT55 to temperature maintain the HWS pipework at 55°C.

Tuesday 3 June 2008

University Of Sheffield - Music Practice Facility
The scope of work was to design, supply and install a trace heating system to maintain the DHWS pipework temperature at +55°C and periodically purge the system to a temperature of 65°C.

Monday 2 June 2008

Audi Showroom - Sheffield 
162m of pipework in the basement area was trace heated to provide frost protection in a minimum ambient temperature of -15°C. ESH supplied and installed type VC constant wattage heating tape.