Friday 19 December 2008

Nestle Purina - Sudbury
Supplied our type SC constant wattage heating tape.

Wednesday 17 December 2008

Harrogate South WWTW
ESH were contracted to replace the old trace heating and thermal insulation with new and to also provide frost protection to the 2" Ø new pipework.

Friday 12 December 2008

Doncaster WWTW
For this project ESH supplied and installed trace heating and thermal insulation to provide frost protection to the 1" Ø Salt Saturates pipework and also the Lamella Feed pipework.

Thursday 11 December 2008

Oasis Academy - Immingham


Designed, supplied and installed 21 Trace Heated step panels for an external stair case. Internally we also supplied and installed a hot water maintenance system on the DHWS pipework which required 1600m of H2OWAT55 tape.

Tuesday 9 December 2008

Seacroft Hospital - Leeds
To design, supply materials and labour to install the trace heating system to provide frost protection to four 25mm Ø flexible hose's & 32mm Ø plastic pipework.

Friday 5 December 2008

Stepan (UK) Ltd - Cheshire
175m of trace heating was supplied and installed to temperature maintain pipework at +42°C in the Blow head area.

Tuesday 2 December 2008

International Logging Technology Ltd - Plymouth
Designed and supplied the materials to temperature maintain a plastic hose at +20°C in a minimum ambient of -40°C in a Gas Group IIB, Classification T3 Hazardous Area.