Thursday 25 September 2008

British Nuclear Fuels - Salwick
ESH designed and supplied 8 x heated jackets and 1 heated hose to maintain the pipework system at +100°C.

Tuesday 16 September 2008

Tesco Supermarket - Hartlepool
Supplied type VC constant wattage heating tape for the prevention of frost formation within the supermarkets sprinkler system.

Thursday 11 September 2008

Market Hall - Bolton
Our second project here, consisted of ESH supplying and installing frost protection to the markets sprinkler pipework.

Friday 5 September 2008

Arla Foods Limited - Settle
Provided temperature maintenance at +20°C to approximately 25m of 1.5" NB plastic pipe containing caustic soda. Supply and install.

Wednesday 3 September 2008

Premier Foods - Nottingham 
Supplied materials and labour to install our type H2OWAT65 self limiting heating tape, to provide temperature maintenance of +65°C.