Tuesday 3 June 2008

University Of Sheffield - Music Practice Facility
The scope of work was to design, supply and install a trace heating system to maintain the DHWS pipework temperature at +55°C and periodically purge the system to a temperature of 65°C.

No comments:

Post a Comment