Friday 27 June 2008

Dairy Crest - Nuneaton
Supplied and installed trace heating to frost protect the following pipework: 

  • 34m of MCWS and 27m of heating pipework on the roof area
  • 35m of MCWS pipework from the high level plant room to a drench shower and wash down tap in the loading bay/skip area
  • 15m of MCWS incoming mains to a drench shower in the ground floor plant room area

No comments:

Post a Comment