Manchester Joint Hospital
ESH supplied and installed the trace heating system to provide frost protection to the chilled water supply: 200m in phase 1, 90m in phase 2, 180m in phase 3.
Mythe Water Treatment Works
To supply and install trace heating to temperature maintain a vessel containing Caustic Soda at +15°C. The existing circuits were removed before the new trace heating was installed.
Rosemont Pharmaceuticals - Leeds
To design, supply materials and labour to install trace heating to provide frost protection to the chilled water services pipework and to temperature maintain the DHWS pipework at +65°C.
Derby STW
ESH went back to Derby STW to install an additional 35m of VC constant wattage heating tape, to frost protect the wash water pipework.
Debenhams - White City
The project scope here was to supply labour and materials to install and commission the following trace heating:
- Frost protection to 66m of roof mounted flow and return copper MCW pipework
- Temperature maintenance at 55°C of 134m of domestic hot water service pipework
Marks & Spencers - White City
920m of VC constant wattage trace heating tape was supplied and installed to provide frost protection to the CHWS & HWS pipework.
Sterecycle Ltd - Rotherham
ESH were contracted to design, supply and install electric trace heating for frost protection to the mild steel TCWS pipework.