Friday, 3 October 2008

Sentrum - Woking 
To supply materials and labour to install and commission trace heating to provide frost protection to the external chilled water pipework, this also included 16m of 100mm/200mm pipework in each of the 3 McQuay chiller units.

Thursday, 2 October 2008

Network Rail - Guildford 
Supplied 480m of type VC constant wattage heating tape to this project.

Thursday, 25 September 2008

British Nuclear Fuels - Salwick
ESH designed and supplied 8 x heated jackets and 1 heated hose to maintain the pipework system at +100°C.

Tuesday, 16 September 2008

Tesco Supermarket - Hartlepool
Supplied type VC constant wattage heating tape for the prevention of frost formation within the supermarkets sprinkler system.

Thursday, 11 September 2008

Market Hall - Bolton
Our second project here, consisted of ESH supplying and installing frost protection to the markets sprinkler pipework.

Friday, 5 September 2008

Arla Foods Limited - Settle
Provided temperature maintenance at +20°C to approximately 25m of 1.5" NB plastic pipe containing caustic soda. Supply and install.

Wednesday, 3 September 2008

Premier Foods - Nottingham 
Supplied materials and labour to install our type H2OWAT65 self limiting heating tape, to provide temperature maintenance of +65°C.