Derby STW
60m of type FBTBOJ self regulating heating tape was supplied and installed onto both steel and plastic pipework to provide frost protection.
Direct Table Foods - Bury St Edmunds
Supplied additional materials and labour to rearrange and extend the original trace heating system.
TK Maxx Store - Humberstone Gate
ESH supplied and installed the hot water trace heating system to be maintained at +55°C. All pipework was indoors and fitted with our H2OWAT55 self limited heating tape.
Motney Hill STW - Kent
Supply only, 150m of FBT self regulating trace heating tape.
Kings Lynn STW - Norfolk
ESH were contracted to supply and install an additional 306m of VC constant wattage heating tape to vairous different pipeworks within this site.
Banwell WTW
Supplied materials and labour to install and commission trace heating to frost protect the following areas:
- Membrane building area
- PAC/Sulphuric acid area
- Phosphoric acid area
- Booster pump kiosk
Marks & Spencer Stores
ESH supplied and installed two new M&S stores - Luton Arndale Centre & White City London, with a Trace Heating system to provide frost protection to both the chilled and hot water pipework. 1250m of VC12/2 was used in total.