Supplied and installed trace heating to frost protect the following pipework:
- 34m of MCWS and 27m of heating pipework on the roof area
- 35m of MCWS pipework from the high level plant room to a drench shower and wash down tap in the loading bay/skip area
- 15m of MCWS incoming mains to a drench shower in the ground floor plant room area