Birch Coppice Ind. Estate - Tamworth
We supplied labour and materials to temperature maintain the indoor domestic hot water service pipework at +55°C.
Wednesday, 30 April 2008
Thursday, 24 April 2008
Wednesday, 23 April 2008
Monday, 21 April 2008
Friday, 18 April 2008
Wednesday, 16 April 2008
Tuesday, 15 April 2008
Friday, 11 April 2008
Tuesday, 8 April 2008
Monday, 7 April 2008
Wednesday, 2 April 2008
Deutsche Bank - Watford
For this large project, ESH designed, supplied materials and labour to install and commission trace heating to provide frost protection to the chilled water pipework and 6 buffer vessels, all external roof mounted in a minimum ambient temperature of -15C. In total this project required 3371m of type VC constant wattage heating tape.
http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html
For this large project, ESH designed, supplied materials and labour to install and commission trace heating to provide frost protection to the chilled water pipework and 6 buffer vessels, all external roof mounted in a minimum ambient temperature of -15C. In total this project required 3371m of type VC constant wattage heating tape.
http://www.traceheatingdirect.com/constant-wattage-parallel-circuit/constant-wattage-heating-tape-type-vcb.html
Subscribe to:
Posts (Atom)