Friday, 29 February 2008

Direct Table Foods - Bury St Edmunds 
Supplied additional materials and labour to rearrange and extend the original trace heating system.

Tuesday, 26 February 2008

TK Maxx Store - Humberstone Gate
ESH supplied and installed the hot water trace heating system to be maintained at +55°C. All pipework was indoors and fitted with our H2OWAT55 self limited heating tape.

Monday, 25 February 2008

Motney Hill STW - Kent
Supply only, 150m of FBT self regulating trace heating tape.

Thursday, 21 February 2008

Kings Lynn STW - Norfolk
ESH were contracted to supply and install an additional 306m of VC constant wattage heating tape to vairous different pipeworks within this site.

Tuesday, 19 February 2008

Banwell WTW
Supplied materials and labour to install and commission trace heating to frost protect the following areas: 

  • Membrane building area
  • PAC/Sulphuric acid area
  • Phosphoric acid area
  • Booster pump kiosk

Monday, 18 February 2008

Marks & Spencer Stores
ESH supplied and installed two new M&S stores - Luton Arndale Centre & White City London, with a Trace Heating system to provide frost protection to both the chilled and hot water pipework. 1250m of VC12/2 was used in total.

Thursday, 14 February 2008

Walsall Manor Hospital
ESH supplied 400m of FBTBOJ self limited heating tape to this ongoing project.

Tuesday, 12 February 2008

Andrew Corporation - USA
Designed and supply 32 x 3.7m dish heater panels designed to fit to the rear of Satellite Receiving Dish Aerials to prevent ice formation.
New Primark - Basingstoke 
The project scope was to supply, install and commission the trace heating system to frost protect the following pipework: 

  • Basement - 40m of ABS chilled water pipework
  • Roof plantroom - 42m of ABS chilled water pipe and 42m of steel heating pipework

Monday, 11 February 2008

Holchem Laboratories - Haslingden 
To supply and install type TF trace heating tape to maintain +20°C on the Caustic Pipework.

Friday, 8 February 2008

Witney SYW
ESH supplied and installed over 400m of FBTBOJ self regulating heating tape to provide frost protection in the PILS area of the site.

Thursday, 7 February 2008

Airedale General Hospital - Keighley 
To supply and install trace heating to the external pipework associated with the San room area and the server room area.

Tuesday, 5 February 2008

Huws Care Home - Nottingham 
Supply materials and labour to install and commission the trace heating systems, to provide frost protection to the exposed pipework on the roof and to maintain the DHWS pipework at +55°C. 115m of pipework in total.